Horizon 2050 Project

HORIZON 2050: HOSPITAL EXPANSION PROJECT

Transforming Dreams into Reality

King Faisal Hospital Rwanda (KFHR) is embarking on an ambitious expansion initiative—Horizon 2050—designed to redefine healthcare delivery in Rwanda and the region. This transformative project will significantly enhance capacity, introduce advanced medical technologies, and expand specialized services to meet growing healthcare demands.

Key Features of the Expansion

  • ✅ 400 private beds for enhanced patient comfort and care
  • ✅ 75 ICU beds to bolster critical care services
  • ✅ 18 modern operating theaters for advanced surgical interventions
  • ✅ 43 centralized post-surgery recovery rooms ensuring optimal post-operative care
  • 🚨 40 emergency beds to improve acute care response
  • 🩸 15 Bone Marrow Transplant (BMT) beds for specialized hematology treatment
  • 💡 3 Linear Accelerator (Linac) units for cutting-edge radiotherapy

Revolutionizing Healthcare Delivery

Beyond infrastructure, the Horizon 2050 project is a strategic leap toward elevating medical excellence. Key objectives include:

  1. ✅ Expanding Specialized Medical Services
  • ✅ Dedicated Stroke, Spine, and Neurology Unit
  • ✅ Enhanced Cardiology & Cardiothoracic Surgery Services
  • ✅ Specialized Orthopedic Surgery
  • ✅ Robotic & Minimally Invasive Surgical Procedures
  • ✅ Advanced Oncology Services (PET scan, cyclotron, radiotherapy)
  • ✅ Organ Transplant Unit
  • ✅ Expanded Critical Care Unit (75 ICU beds total)
  1. ✅ Reducing Medical Referrals Abroad
  2. ✅ Attracting Medical Tourism
  3. ✅ Increasing Capacity for Enhanced Access
  4. ✅ Renovating Existing Infrastructure

Proposed Project Timeline

Date Activity
April-July, 2024 Procurement process (Contractors and Consultants)
September 2024-January 2025 Detailed facility design, compliance with international standards, and engineering details phase
July 22, 2024 Groundbreaking
February 2025 Initiation of the construction phase
February 2027 Project completion and commissioning
July 2027 Project handover

Progress Update

International Contractor Site Visit

On April 17, 2024, seven prequalified international contractors conducted a site visit to assess project requirements before submitting proposals. This marks a critical milestone in bringing the KFHR Horizon 2050 Expansion Project to fruition.

Groundbreaking Ceremony

On July 22, 2024, His Excellency President Paul Kagame officiated the groundbreaking ceremony, marking the commencement of construction to elevate King Faisal Hospital Rwanda’s capacity from 167 to 567 beds — a major milestone in the hospital’s long-term vision.

A Vision for the Future

The Horizon 2050 expansion is more than a structural upgrade—it’s a commitment to advancing healthcare excellence, accessibility, and innovation for Rwanda and beyond.

For further updates, stay connected with King Faisal Hospital Rwanda.

Our Services

Ketamine Treatment & Research Center

body { font-family: 'Roboto', sans-serif; margin: 0; padding: 0; background-color:…

Neurosurgery

Redefining Brain and Spine Surgery in the Region The Neurosurgery…

Occupational & Physiotherapy

Rebuilding Strength. Restoring Function. Enhancing Quality of Life. The Occupational…

Gastroenterology

Expert Digestive Health Services The Gastroenterology (GI) Unit at King…

Nutrition and Dietetics

Personalized Nutrition for Better Health and Healing The Nutrition and…

Neurology

Expert Care for Brain, Nerve, and Sleep Health at King…

Cardiac Surgery

World-Class Surgical Excellence for All Age Groups King Faisal Hospital…

Neonatology

Advanced Care for Premature and Critically Ill Newborns The Neonatology…

31

Years of Experience

150+

Our Doctors

167+

Bed Capacity

37+

Medical Specialities